From: route@monster.com
Sent: Thursday, April 07, 2016 12:03 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
SARITHA BANDARU Email:
sarithabandaru@yahoo.com Contact
No: (862) 812-7929 EDUCATION 1998 Nagarjuna University—Andhra
Pradesh, India. Received Bachelors in Civil Engineering; Post Graduate Diploma in Computer Applications EXPERIENCE & SKILLS 2011July – Present Freeport-McMoRan Copper & Gold –
Phoenix, Arizona Mining EPC construction Work.
Position: Master Scheduler Responsibilites: Responsible for the Integrated
Master Schedule for all projects run by the corporate office including future
development schedules, maintaining and updating the
same, Baseline Schedule, resource loading, cost loading , Schedule Review and
Crtical Path Analysis, What if schedules of EPC Contractor schedules, Scheduling
Procedures and provide training and technical support, guidance for site
schedulers and P6 Web administrator for Projects (Cloud implementation using
the dedicated database servers hosted by Critigen). 2010 February – 2011 June Tesserasolar – Scottsdale,
Arizona Solar Work. Position: Master
Scheduler Responsibilites: Responsible for the Integrated
project schedules for 709 MW Imperial Valley Solar Project and 663 MW
Calico Solar Project California. Project
includes Construction of Collector System, Substation, Transmission Line,
Hydrogen System Generation, Water Supply and Treatment System, Adminstration
and Maintencance Building and Individual Compressor Groups consisting
Pedestals, Suncatchers and Solar Field construction. Responsible
for creating Integrated Master schedule, maintaining and updating the same,
target Schedule, resource loading, cost loading , Schedule Review and
Analysis of Constractor schedule. 2009 November – 2010 January PCI – Tempe, Arizona Intel Work. Position: Sr.
Project Scheduler Responsibilites: Responsible for the project
schedule for Intel Fab22 - Package B06 Civil,
Structural and Architectural scope Chandler, AZ. Project includes SubFab Architectural Demo and
construction of New Pads for EC-1, EC-2, MAH and EXAM , South Scrubber
Yard and Spec Gas Dock and PWB Interior, Air Lock Vestibule1 & 2. Responsible for creating, maintaining, and updating
master Schedule for PCI Scope and Attending Schedule Update meetings. 2008 – 2009 Kitchell – Phoenix, Arizona Casino Work. Position: Sr.
Project Scheduler Responsibilites: Responsible for the project
schedule for Wild Horse Pass Casino and Hotel,
Chandler, AZ. Project includes
construction of new Casino 125,000 sqft with Theater and new
construction of Hotel 10 floors 200,000 sqft. Responsible
for creating, maintaining, and updating master Schedule, target Schedule,
resource loading, cost loading and Schedule Analysis. 2006 –2008 Gilbane Building Co.— Phoenix, Arizona Commericial work. Posistion:
Sr.Project Scheduler Responsiblities: Responsible for the
project schedule for Calpoly Eng IV building, Sanlouis Obispo, CA.
Project included demolition of existing structructures, building of new three
level 150,000 sqft structure. with Lab Spaces and Admin offices. Responsible
for creating, maintaining, and updating master schedule, target schedule,
resource loading, and cost loading. Also assisted Buisness Development team
with the proposal schedules. Additional repsonsibilites included Third Party
schedule reviews. 2005 – 2006 Skanska USA— Summit, NJ Commercial work. Position:
Project Scheduler Responsibilities as the project
scheduler for the Schering Plough Office
Renovations & Parking Deck project included renovation of 6 existing administrative office buildings
Buildings totaling 441,000 sq. ft. and expansion of Parking Deck to
provide a minimum of 1350 parking spaces. Responsible for development
of the master schedule, target schedule, resource loading, cost loading,
updating, maintenance, and regular schedule distrubution. 2001 – 2005 FLUOR— Parsippany, NJ/Boston, MA Commercial work. Position:
Project Engineer/Scheduler Pfizer
Parsippany Technical Center (2005) Project
inluded renovation of an existing 51,000 sq.ft. 3-story office building,
demolition of an existing 35,000 sq.ft.1-story lab building and construction
of a 143,000sq.ft Lab which included a Pilot Plant. Responsible for
developing master schedule and updates. Involved in admin of project
documents, bid packages, and working with Architect/Engineer/Subcontractors
in coordinating the designed drawings, RFI’s, submittals, deviations, and
field construction. Additionally, provided training for the project team in
using web based Meridian software (Prolog). Schepens
Eye Research Institute (2003-2005)
Laboratory Improvements project. Project included laboratory renovations at
the largest eye research institute in the country. Responsible for
execution of document management system including generating submittal
register, closeout register, processing submittals, RFI’s, sketches,
deviations, updating corresponding logs, schedule updates, maintenance and
closeout of the project. U.S.
Consulate Renovations, Sao Paulo, Brazil (2001 - 2003) Project Engineer for renovation of
consulate office building and compound. Responsibilities included execution of project
documentation for drawings, processing RFI’s, submittals, closeouts and
interaction with A/E and subcontractors. SKILLS
& KNOWLEGDE |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|